Resources
Resources
Mature Field PE IntegrationDec 01, 2014
PROJECT CHALLENGE
ENTI undertook production enhancement integration of 9 mature wells from PetroChina in Fushan oilfield, Hainan. The complex structure, lithology, multiple layers, obvious thin interbeds with poor reservoir properties and high formation temperature generated extreme challenges in fracturing.
 
SOLUTIONS
ENTI integrated superior resources from fracturing design to site operation, fracturing fluid system, stage stimulation etc. and a complete quality system which ensured the overall service quality. High temperature downhole tools were selected and appropriate displacement created the main fractures. ENTI-101 low density high strength proppant was added and an ENTI-HTCF high temperature low damage frac flood was utilized.

ACHIEVEMENTS
ENTI finished fracturing operation of the 9 wells in 25 days with remarkable effect, creating the best results of fracturing in the field. We were congratulated by the operator and offered PE integration service for another 10 mature and new wells.
 
\


Overiew
ENTI undertook PE integration of 9 mature wells in Fushan oilfield.