ENTI Cooperates with China University of Petroleum (Beijing)
Sep 14, 2015
ENTI’s Visit to Karamay
May 05, 2015
** Well Produced Oil about 131 CBM Per Day
Oct 12, 2013
Multistage & Multiple Clusters Fracturing of Bridge Plug
May 27, 2013
Multistage & Multiple Clusters Fracturing of Horizontal Wells
Oct 12, 2012
Technical Exchange Held Between ENTI & Shengli Oilfield
Mar 20, 2012
CCDC Signed A Memorandum of Cooperation with ENTI
May 18, 2011
Our GEO-Engineering and Project Management (GEPMTM) groups work in tandem to study geological reservoirs using 3D mapping technologies. The resulting data allows for more accurate planning in the engineering, design and operational phases of energy recovery. This targeted approach improves the production capacity of individual well within the broader scheme of an expansive integrated project.
ENTI’s GEPMTM services focus on three key aspects: Reservoir, Drilling, and Completion. These three points comprise our ‘Quality Triangle’, which we use as a foundation for generating research, drafting engineering designs and appointing technological strategies.
GETC utilizes a range of software to generate and analyze project data including industry standards (Petrel, VISAGE, ECLIPSE, Techlog) as well as ENTI’s proprietary programs. We design accordingly, taking into account the site and reservoir challenges and provide customized solutions that address all phases of a project including: exploration, evaluation, development and production.
Copyright (C) 2016 ENTI
ENTI All Rights Reserved | Legal Statement | Website Map | Contact Us